Technology
Technology approach(es) used to catalyse investment:A change in regulation
This use case explores technologies that change the standard emission-heavy wastewater treatment processes into more sustainable processes.
Greenhouse gas emissions of methane (CH4) and nitrous oxide (N2O) from wastewater treatment can be reduced through better monitoring technologies and optimising treatment processes. Data from monitoring technologies, such as atmospheric emission sensors or wastewater sensors, to measure dissolved CH4 or N2O will be critical to find short- and medium-term mitigation solutions and downstream technologies that use existing infrastructure and control systems to reduce or eliminate the emissions. Long-term solutions will look at alternative low greenhouse gas emission wastewater treatment processes that are not restricted by the current centralised treatment model.
Climate change is a critical challenge for the entire global community and natural environment. Reducing the generation of greenhouse gas emissions from wastewater treatment is one of the steps cities and countries can take to lessen their impact on the environment.
The amount of greenhouse gas emissions from wastewater treatment plants is often underestimated. Due to the physical and chemical reactions involving carbon and nitrogen in standard wastewater treatment process, CH4 and N2O are an inevitable by-product. N2O is 300 times more potent as a greenhouse gas compared to carbon dioxide (CO2)[1], so even a low emission levels will contribute significantly to a wastewater treatment plant’s greenhouse gas footprint. Similarly, methane is 25 times more potent than CO2. N2O emissions from wastewater handling is estimated to contribute 26% to the total greenhouse gas emissions of the whole water supply chain (drinking water production, distribution, wastewater collection and treatment). This totals to approximately 330,000 tonnes of N2O[2] globally, which is equivalent to nearly 100 million tonnes of CO2 in the atmosphere.
The desired outcome is better monitoring technologies to better quantify emissions. This information can then be used to inform treatment alterations and optimise existing systems to mitigate emissions. These steps can reduce CH4 and N2O oxide emissions from current wastewater treatment plant configurations.
In the long term, the standard wastewater treatment process may need to be challenged to eliminate emissions. These future treatment processes will also need to be energy efficient; adaptable to climate change; as well as scalable with population growth. These types of solutions are still in research phase and may be in the form of different types of centralised or decentralised treatment.
Enhancing economic, social and environmental value:
Reshaping infrastructure demand and creating new markets
Legislation and regulation: Legislation on emissions reductions targets are already driving the change to lower emission wastewater treatment plants. Governments can ensure their policy is up to the highest standard and include clear regulations on wastewater treatment standards. Policy can include monitoring and measuring of greenhouse gases from wastewater treatment.
Procurement and contract management: Procurement for new projects and upgrade projects should allow for the use of innovative treatment methods. Contracts could include a requirement for greenhouse gas consideration in the form of measurement and reduction.
Funding and financing: Technologies that shift towards a low or zero emission wastewater treatment will be an added capital expenditure to water operators. Financial incentives and subsidies from government agencies on low emission technologies will assist in accelerating the shift in both publicly and privately owned treatment facilities.
Implementation / Economic risk
Risk: New technologies may not be suited for current wastewater infrastructure, and there is a risk of not realising the full return on the substantial investment into current wastewater treatment plants.
Mitigation: Focus on treatment augmentation and monitoring programs that utilise the wastewater treatment infrastructure. Start planning for more diverse technologies when current infrastructure is reaching the end of its life. The decreased economic impact of climate change from reduced emissions may offset investment into new infrastructure.
Environmental and social risk
Risk: Changing and optimising wastewater treatment plants have the risk of affecting the quality of water or sludge being discharged and disposed of into the environment. This can be harmful to local water ecosystems and affect wildlife and increase health risks downstream.
Mitigation: Appropriate piloting programs are needed to ensure all changes to treatment processes do not result in a negative change to discharge sludge or water into environment.
Example: Cobalt Water
Implementation: AI and machine learning N2O risk model to identify emission mitigation strategies has been implemented in wastewater treatment plants in the Netherlands. 40% and 70% reductions in overall greenhouse gas emissions were achieved at the Eindhoven and Land van Cuijk plants, respectively, by focusing on N2O emissions and proposing minor process adjustments.
Cost: Approximate costs of annual software subscription is USD 10,000 to identify and implement a mitigation strategy. A one-time greenhouse gas reduction fee is assessed based upon ton CO2e reduced.
Timeframe: Using SaaS tool, strategies can be developed and implemented within 2-3 months.
Example: Organics
Implementation: The thermal ammonia stripping technology has been installed on a 200 tonne per day food waste anaerobic digestion facility in Hong Kong, removing ammonia from the digester centrate, preventing N2O formation and ensuring discharge compliance.
Cost: Cost are highly dependent on the volume of wastewater and ammonia concentration being treated. For example, to treat 500 m3/hr of wastewater with an ammonium concentration of 2000mg/l to a level of 100mg/l would cost approximately USD 2 million.
Timeframe: A fully operational facility typically takes 10 - 12 months to deliver.
Example: Cranfield University
Implementation: A novel way of removing nitrogen and carbon containing compounds from wastewater using membranes and media filters to avoid the formation of N2O and CH4. This is currently in the pre-commercial phase and has not been applied to wastewater infrastructure yet.
Cost: Cost will vary depending on the size of treatment plant and volumes of wastewater.
Timeframe: This solution can be implemented within existing wastewater treatment infrastructure.