54 results found
China Eximbank actively uses the People’s Bank of China’s facilities of carbon emissions to promote green and low-carbon development.
Zhengzhou Unicom, together with China Unicom digital technology and ZTE, deployed a 5G + MEC private network to improve the reliability of end-to-end data transmission to ensure that the data does not leave the industrial park laying a solid foundation for 5G application security in industrial parks
To improve economic and cultural connections between China and Vietnam, Chongzuo Urban Construction Investment and Development Co is enhancing the development of areas along the road that connects them by utilising The Digital Management and Control Platform
With an installed capacity of 450MW, accounting for 37.5% of the total installed capacity, the project is part of the Zhangjiakou-Beijing Renewable Energy-Powered Clean Heating Demonstration. It has the largest single investment and the highest construction standard of its kind.
Dayu Irrigation Group Co., Ltd. developed and deployed a water network system for farmland irrigation and established a management network and service network that are digital and intelligent
To help transition to a low-carbon green economy, China announced plans to grow a corporate green bond market, establishing pilot zones in five provinces and autonomous regions to inform national green finance policies.
As issues such as energy security, environmental protection and climate change become increasingly prominent, accelerating the development of new energy has become the general consensus and concerted action of the international community in order to promote energy generation transformation and address climate change.
Taiyuan, like most northern cities in China, faces a serious shortage of clean heating and heat sources. Under the double pressure of environmental protection and people's livelihood, the Taiyuan government has adopted a low-cost, low energy consumption, environmental protection, which takes into account environment, peoples? livelihood and safety such as the Gujiao power plant, a long-distance transmission heat supply project using waste disposal heat.
Parties involved (public and private): The investment and construction of the project follows a "1 + 1 + X" model for investment and construction: 1 is the power company, 1 is the local government platform company, X is the social capital, which together forms the formation of multi-party joint platform company
Since the large-scale construction project was started in 1979, the Beijing Natural Gas Utilization System Project’s total investment has exceeded 30 billion RMB
Construct and operate 9 sections of expressway.
The project covers four towns around the county, benefiting 13,300 households and 126,300 people.After the implementation of the project, the average annual water saving is 21.58 million m3, and the water saving rate is 48.6%.
The project includes three subprojects: transfer solid waste to electricity, transfer food leftovers to biogas, transfer food leftovers to biodiesel.
Erhai Lake, whose basin area is 2,565 square kilometers with 117 rivers flowing into the lake, is the main drinking water source of the City of Dali, covering 16 villages and towns of Dali with a population of 833,000 people.
Converting old unused mineshafts and canals into 'geothermal boilers' to produce electricity that can be transported to homes or public spaces.
Combination of sensors and AI to increase sewer capacity and reduce the frequency and magnitude of sewer overflows, especially during high rainfall events.
Building Information Modelling (BIM) and pre-fabrication technology being used in conjunction to enable the project to be built virtually before construction, reducing issues or inefficiencies that can arise during the construction stage.
The development of credit ratings for loans in emerging countries is critical for accessing capital markets
The African Development Bank (AfDB) is mandated to drive social and economic development in Africa through multiple project types including infrastructure